Castec Projects
Castec Projects
Bellevue Hill
- Boronia Rd.
- Four straight runs 60 lin m
- Depth 6m
- Five days





Bonanza Rd, Sans Souci
2017
- Single level basement
- Cantilever Walls
- Water Table 800mm




New South Head Road, Double Bay
2017
- 2 Level deep basement car park
- Temporary anchors during excavation
- Designed as permanent load bearing walls
- Walls taken down to rock
- Followed by over 200 Helcon Steel Screw Piles












Coogee Beach Tennis Club, Bream St
2017
- Single Castec shoring wall to support road + foot path plus existing sand stone wall
- Buttress walls used for temporary support during excavation






Bonanza Pole Sans Souci
2017
- Single level basement
- Cantilever walls
- Water table 800mm below natural ground
- De-watering installed for excavation
- Water proof membrane lapped under the slab and up the walls



Glasgow Ave Bondi
2016
- Single level basement
- Steel braces for temporary support during excavation